Page 8 - GN-DEC2013

Basic HTML Version

8
Geotechnical News • December 2013
www.geotechnicalnews.com
GEOTECHNICAL
A Reusable Instrumented Test Pile for Improved Pile Design
29
INSTRUMENTATION NEWS
Jason DeJong, Aravinthan Thurairajah, Mason Ghafghazi
Discussions of: ‘Field monitoring challenges,
Episode 2 Unforeseen movements (depth and magnitude)’
33
Storer J. Boone
GROUNDWATER
Contamination of Till Aquitard by DNAPL:
Is it Actual, or Drilling Artefact?
36
Robert P. Chapuis
WASTE GEOTECHNICS
Landmark research on oil sands mine closure landforms
underway at the University of Saskatchewan
41
Vivian Giang
GEOENGINEER
The First Interactive
GeoSoftware Database is here!
43
DEPARTMENTS
CGS News
10
Geotechnical Instrumentation News
29
Groundwater
36
The Grout Line
39
Waste Geotechnics
41
Geoengineer.org
43
Book Review
44
Cover
Image of dynamic installation of Reusable Test Pile at Oakland, CA
test site using the Becker drill rig. (Photo by Jason DeJong).
CON T E N T S
Volume 31 • Number 4 • December 2013
Contents Head V3141213.indd 1
13-02-04 7:06 PM