Page 13 - GN-MARCH2014
Basic HTML Version
View Full Version
Table of Contents
Page 12
Page 14
GEOPIER IS GROUND IMPROVEMENT.™
Work with engineers worldwide to solve your ground improvement challenges.
Plans for a 150,000 square foot apartment complex in Irvine,
CA featured a common “wrap” style structure, with 4-story
apartments surrounding a 4.5-story parking garage. The site
was underlain by 20 to 25 feet of soft to medium stiff lean clay
with groundwater encountered at depths of 8 to 10 feet. The clay
was underlain by stiff clay and dense sand to a depth of 50 feet.
Reconciling the settlement tolerances between the apartments and
the parking structure presented a unique design challenge. The GP3®
system was an ideal solution, meeting the specified settlement
tolerance for 1” total foundation settlement and ½ inch differential
between the parking structure and the apartments. By reducing
total settlements and accelerating time rate of settlement for all
structures, GP3 eliminated the need for a 6-9 month surcharge.
THE GEOPIER GP3 SYSTEM: CONTROLLING SETTLEMENT
For more information call
800-371-7470
,
e-mail
info@geopier.com
or visit
geopier.com
.
©2014 Geopier Foundation Company, Inc. The Geopier® technology and brand names are protected under U.S. patents and trademarks listed at www.geopier.com/patents and other trademark applications
and patents pending. Other foreign patents, patent applications, trademark registrations, and trademark applications also exist.
WE HELP YOU FIX BAD GROUND.