Page 7 - GN-DECEMBER-2014
Basic HTML Version
View Full Version
Table of Contents
Page 6
Page 8
Geopac Provides “Dry Box” Solution to Allow Construction
of Underground Parkade in Richmond, BC
The GEOMIX “Dry Box” technique is an effective ground engineering concept which allows
below-grade construction in saturated soils eliminating continuous dewatering and
subsequent treatment to satisfy environmental regulations.
In choosing Geopac's innovative solution, developers are able to build an underground car
parkade in dry conditions in a high water table environment within highly permeable soils
such as generally encountered in river deltas and coastal locations.
GEOMIX technology offers the advantage to combine deep permeability cut-off (up to 35m)
with a multi-storey retaining wall capability, thus enabling dry and stable below grade
constructionworks and virtually eliminating dewatering and associated treatment costs.
SILT CRUST
ANCHOR
MARINE SILTS
LOWERED WATER TABLE
CUT-OFF WALL
RETAINING WALL
UNDERGROUND PARKADE
Toronto
905-862-9032
Montreal
450-449-2633
Vancouver
604-241-7151
General Enquiries
info@geopac.ca
Website
geopac.ca
SAND
ANCHOR
BUILD ON US