Page 9 - GN-DECEMBER-2014
Basic HTML Version
View Full Version
Table of Contents
Page 8
Page 10
$5.5 Billion Panama Canal Project Relied
on Bentley Geotechnical Software
© 2013 Bentley Systems, Incorporated. Bentley, and the “B” Bentley logo are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. Other
brands and product names are trademarks of their respective owners.
When the cost of dredging 20 million cubic meters is calculated on type and volume of materials – and on
whether it is above or below sea level – you need accuracy you can rely on. The $5.5 billion Panama Canal
widening project consists of more than 10 different types of material and methods of removal. Jan De Nul used
Bentley’s geotechnical software to store and analyze geological data and used our road design software to build
3D models of the material profiles that were also used for machine control.
For more than 25 years, global engineering firms, transportation agencies, and municipalities have depended on
Bentley to design and build the world’s most innovative projects. You can too.
www.Bentley.com/geotechnical
To Access Integrated Subsurface Data for
Intelligent Decision Making
Panama Canal Widening Project