44
                
              
            
            
              
                Geotechnical News • December 2012
              
            
            
              
                www.geotechnicalnews.com
              
            
            
              
                THE GROUT LINE
              
            
            
              • Displacement sensors connected
            
            
              with the main unit and attached to
            
            
              the micropile/anchor with a mag-
            
            
              netic plate. See picture #3. Usually
            
            
              two sensors are available. One for
            
            
              the micropile/anchor head and the
            
            
              other for the micropile reference on
            
            
              the ground or the wall for the an-
            
            
              chor.
            
            
              • Pressure sensor to be installed in
            
            
              the circuit of the hydraulic oil and
            
            
              connected with the main unit. See
            
            
              picture #4.
            
            
              • Memory card reader.
            
            
              • Software.
            
            
              The apparatus allows measurement,
            
            
              visualization in real time, as well as
            
            
              printing and
            
            
              recording of all
            
            
              the parameters
            
            
              used in a tension/
            
            
              compression test
            
            
              such as:
            
            
              • Load (tension
            
            
              or compres-
            
            
              sion),
            
            
              • M i c r o p i l e /
            
            
              anchor dis-
            
            
              placement,
            
            
              • Ground/ wall
            
            
              displacement,
            
            
              • Stressing time.
            
            
              
                Picture 3. Displacement sensor.
              
            
            
              
                Picture 2. Main recording unit.
              
            
            
              
                Picture 4. Pressure sensor
              
            
            
              
                Picture 5. Seismic anchor installed.
              
            
            
              
                Picture 6. Testing.