Geotechnical News - March 2016 - page 4

4
Geotechnical News • March 2016
GEOTECHNICAL
The fundamentals of vibration monitoring -
INSTRUMENTATION NEWS
things to consider
25
Bob Turnbull
Discussions of
Qualifications of the robotic total station
construction monitoring professional
27
Douglas Roy and Jonathan Stuhl, Martin Beth , Joel Volterra
General role of instrumentation, and summaries of instruments
that can be considered for helping to provide
answers to possible geotechnical questions, Part 2
32
John Dunnicliff
Report on 9th Symposium of Field Measurements in
Geomechanics
34
Andrew Ridley
The future of FMGM
35
Andrew Ridley
WASTE GEOTECHNICS
Academics and industry join forces to raise the bar
on dam engineering
37
Richard Cairney
THE GROUT LINE
GIN Method (II) Case Histories
Case History 1 - Carno Dam, South Wales, 2009
41
Case History 2 - Lee Tunnel, England, 2013
46
Clif Kettle and Maren Katterbach
GEO-INTEREST
Dispute resolution in geotechnical engineering practice -
some lessons learned
49
M.A.J . (Fred) Matich, John L. Seychuk, Gordon C. McRostie
DEPARTMENTS
CGS News
7
Geotechnical Instrumentation News
25
Waste Geotechnics
37
The Grout Line
39
Geo-Interest
49
Cover
Seepage evidence at Carno Dam, South Wales
See article page 41.
CON T E N T S
Volume 34 • Number 1 • March 2016
1,2,3 5,6,7,8,9,10,11,12,13,14,...60
Powered by FlippingBook